Construction of the civil works La Joya Dam
Costa Rica
2003 | 2006
The project consists in the design and construction of the La Joya hydroelectric plant complete of mechanical, electrical and electronic plants required and plants servicing the dam with a 8km tunnel connecting the outlet tank to a loading tank.
A Double Shield TBM has been chosen during the design phase with a diameter of 6.18m and finished with internal tunnel lining for an overall of almost 34000 segments.