Napoli-Bari Itinerary, section Telese – San Lorenzo Maggiore – Vitulano
2021 | ONGOING
The NA-BA Telese – San Lorenzo Maggiore – Vitulano railway project belongs to the realization program of new Naples - Bari highspeed railway line in the southern quadrant of Italy and consists in the executive design and construction of a railway track that develops for approximately 20km.
The Naples-Bari High Speed Railway is an integral part of the Trans-European Transport Networks (TEN – T), more precisely of the Scandinavian-Mediterranean Corridor and also in the “Sblocca Italia” law.
This route has a crucial role in the development of Southern Italy connecting two of its most important cities and moreover it will allow a drastic reduction of CO2 emissions in the entire area.
The doubling of the route, consisting of the two functional lots, Telese - San Lorenzo Maggiore and San Lorenzo Maggiore - Vitulano, will allow for a more reliable railway service as a result of an increase in safety standards but also the elimination of all the existing level crossings which exist on the current line, in operation.
Ghella had already won other two lots of the Naples - Bari HS Railway line: the Cancello - Frasso Telesino and Frasso Telesino – Telese. Both contracts foresee the executive design and realization of a 30km extension, between the districts of Napoli and Benvenuto, of the historical line.